Concrete Driveway Replacement in Lost Creek, Texas
Heritage Concrete Austin takes on concrete driveway replacement in Lost Creek, Texas: the old drive is broken out, the base beneath it rebuilt, and a new slab poured with fresh joints. In the Census Bureau's 2020–2024 estimates, the neighbourhood's median year built is 1977, and roughly 61% of its homes predate 1980.
Lost Creek has been an unincorporated part of Travis County since September 10, 2024, when its disannexation from the City of Austin took effect. The neighbourhood follows Lost Creek Boulevard, which curves 1.8 miles from Loop 360 down to Barton Creek past the community park at Quaker Ridge Drive, and the same census area takes in the smaller neighbourhoods of Parkstone, Woods of Westlake, Camelot and Knollwood. The estimate is free: call, or send the details through the form.
Call or request a free estimate any time, 24/7
No charge · answered 24/7
Get free estimates

A 1970s neighbourhood that is almost fully built
Developers began planning homes here in 1972, aiming for a premier community in the Eanes School District with underground utilities and sewer service. A municipal utility district was formed to fund water and sewer, and a country club was built in the valley below, along Barton Creek. About 50 houses stood when the neighbourhood association was organised in 1976; building went on for more than three decades, and the area is now almost completely built out. The neighbourhood takes its name from a secluded stretch of Barton Creek, upstream of Barton Springs and Zilker Park.
The 2020 Census counted 1,276 residents and 451 housing units. In the 2020–2024 estimates, about 90% of homes are single-family detached houses and about 84% are owner-occupied, with a median value of $1,163,100 for those owner-occupied homes. Age is one test for a driveway: national cost guides suggest considering replacement once a concrete driveway is older than 25 years, or sooner if it has multiple large cracks, buckling or drainage problems.
Call or request a free estimate any time, 24/7.
(512) 588-2862Since leaving Austin: who approves a new driveway
The City of Austin annexed Lost Creek in December 2015. At that point residents voted to turn the Lost Creek MUD into the Lost Creek Limited District, which still funds the common spaces and enforces the deed restrictions. Voters then approved leaving the city on May 4, 2024; the City Council passed the disannexation ordinance on August 29, 2024, and it took effect on September 10, 2024.
Beyond city limits, permits are the job of Travis County Development Services. Paving is on the County's list of what counts as development, and the County requires a permit for every development within its borders. The Limited District adds that Travis County, City of Austin and ESD 9 (Westlake Fire Department) permits may also be needed for a project, and that its architectural committee doesn't issue any of them. Ask the County how its rule applies to replacing a drive on your own lot before the old slab comes out.
Where the drive meets the street
Which agency approves the approach depends on the road. A county-maintained road means Travis County and its Driveway Permit; a state road means TxDOT; and a road the County doesn't maintain gets no County permit at all. Who maintains Lost Creek's streets since disannexation is the first thing to confirm. The County accepts only concrete or asphalt for an approach, ruling out pavers and stone, and caps its grade at 15% unless it signs off on a steeper one. On curb-and-gutter streets a property gets two approaches per street at most, spaced 35 feet or more apart measured between their inside edges, and the drive's grade can't pass 2% where a sidewalk crosses it.
Call or request a free estimate any time, 24/7.
(512) 588-2862Deed restrictions and the Architectural Control Committee
Every home in Lost Creek is covered by deed restrictions, the covenants each owner accepts at purchase. They require approval for many common building and remodelling projects; the neighbourhood association's Architectural Control Committee handles the requests, and approval has to come before work begins. The committee may also ask neighbours who could be affected for their input, while enforcement belongs to the Limited District, which can take a violation to court. Ask the committee which rules on driveway materials and widths apply to your lot when you send in the plans.
Call or request a free estimate any time, 24/7.
(512) 588-2862Building the new slab
Break-out and base
A replacement starts with getting the old drive out, and a cubic foot of normal-weight concrete comes to 140 to 150 pounds. Crushed, recycled concrete can serve well as the base course under the new slab. Under ACI 302, the base is a compactable granular material carrying 10 to 30% fines, free of clay, silt and organic matter, and the subbase and base together should total at least 4 inches.
Mix and joints
Driveway concrete should have a slump of about 4 inches, with slumps above 5 inches to be avoided (a Portland Cement Association warning) and a water-cement ratio below 0.50. NRMCA sets contraction-joint depth at one-quarter of the slab thickness or more, never under 1 inch, with the cuts made 1 to 4 hours after finishing using early-entry saws or 4 to 12 hours after using conventional ones.
Pouring in summer heat
In hot weather, the American Concrete Institute's specification caps concrete temperature at 95°F at discharge. NRMCA adds that chilling the mixing water can lower the concrete's temperature by up to 10°F, and using ice by up to 20°F. It also warns against adding water to a batch past 1½ hours old in hot weather, and calls for at least 3 days of curing. Heat is routine here: Camp Mabry, Austin's official climate station, averaged about 29 days a year reaching 100°F or above over 1991–2020. Seven days in, a new driveway has gained about 70% of its potential strength, but an RV, a large truck or anything similarly heavy should wait 28 days or more.
Call or request a free estimate any time, 24/7.
(512) 588-2862Concrete driveway replacement cost
National cost guides put replacing a concrete driveway at $8 to $20 per square foot in 2026. Thickness moves the price: those guides put a standard 4-inch slab at $6 to $15 a square foot against $8 to $20 for 6 inches, with professional grading adding $3 to $8 a square foot and rebar $1 to $3. An online calculator, given downtown Austin's ZIP code, returns $8.93 to $10.96 a square foot for a basic driveway (September 2026), before any contractor markup, sales tax or permit and inspection fees.
None of these are our prices, only published averages. Your figure depends on the size of the drive, the approach and what the base needs, and the estimate is free.
- Grading, national
- $3–$8 / sq ft
- Replacement, national
- $8–$20 / sq ft
- 4-inch slab, national
- $6–$15 / sq ft
- 6-inch slab, national
- $8–$20 / sq ft
- Rebar, national
- $1–$3 / sq ft
- Basic driveway, Austin ZIP
- $8.93–$10.96 / sq ft
2026 national averages and an Austin-area calculator figure. Averages, not a quote.
Call or request a free estimate any time, 24/7.
(512) 588-2862Other concrete services near Lost Creek
Along with replacement, we repair drives that still have years left in them, and build retaining walls, steps, patios and walkways, with stamped or exposed aggregate finishes where the deed restrictions allow them. For neighbours, Heritage Concrete Austin pours concrete pool decks in Barton Creek and puts up concrete retaining walls in West Lake Hills.
Call or request a free estimate any time, 24/7.
(512) 588-2862How a driveway replacement runs
General practice; the approvals and the base work depend on your lot and street.
Free estimate and measurements
We measure the drive, look at the approach and the fall to the street, and note what made the old slab fail.
Committee and County
Plans go to the Architectural Control Committee first; then the Travis County, City and ESD 9 permits the Limited District says a project may need are checked.
Break-out and base
The old slab comes out and is hauled away, weak spots in the ground are fixed, and a compacted granular base is laid.
Forms, steel and pour
Forms and reinforcement are set, the concrete is placed and finished, and the joints are sawn within hours.
Curing and first use
Hot-weather curing runs 3 days or more; cars can use the drive after about a week, heavy vehicles after 28 days.
Call or request a free estimate any time, 24/7.
(512) 588-2862Questions about replacing a driveway
What can I replace my concrete driveway with?
Where the drive meets a county road, Travis County allows only concrete or asphalt in the approach. Past the property line the deed restrictions may have a say, so check with the Architectural Control Committee. Concrete itself comes in price tiers: national 2026 figures run from $6 to $10 a square foot for standard gray concrete, to $10 to $15 for a basic finish such as broom texture, one stain color or exposed aggregate, to $15 to $20 for stamped work with two or three colors.
Do City of Austin rules still apply in Lost Creek?
Lost Creek left the city on September 10, 2024, so Travis County handles permits outside city limits. The Limited District still lists City of Austin permits among those a project may need, alongside Travis County and ESD 9 permits. Whether Lost Creek now falls inside Austin's extraterritorial jurisdiction (land beyond the city limits over which the City keeps limited control) isn't confirmed, so ask both offices about your address.
Request a free driveway replacement estimate
Heritage Concrete Austin answers 24/7 and prices new driveways in Lost Creek and the nearby west-side towns at no charge.
